FracSET Repair Enables Recovery of Lost Reserves
An operator in the northern Colorado, Piceance basin discovered parted 4-1/2 in. casing which meant they would not be able to frac the lower six stages of the well. The operator initially used conventional methods in an effort to repair the damaged casing but were not successful.
Read the full case history to learn how the FracSET Repair solution enabled the operator to restore casing integrity and recover lost reserves.
