In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations that facilitated a fracture stimulation treatment of lower perforations to enhance well value.
Register or log in to download the entire document.