Injection Control Increases Production

Summary: 

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb SET® Cased-hole Liners (CHL) to isolate the upper perforations in each well would enable injection through newly-perforated lower intervals.

Translated files
Portuguese version title: 
Controle de injeção aumenta a produção

Register or log in to download the entire document.