Total E & P USA, Inc.

Summary: 

Drill through 200 feet of depleted sands, add a casing point and reach the pay target (measured depth between 11,000 to 13,000 feet) with adequate hole size while maintaining the smallest upper wellbore possible.

Translated files
Chinese version title: 
TOTAL E&P USA, Inc.

Register or log in to download the entire document.