ESeal™ HP Liner Restores Well Integrity; Enables Frac Job Completion With 200% More Flow Area

Summary:

An Operator in the EagleFord Basin of South Texas was 15 stages in to their 37-stage frac job when they encountered damaged intervals in the casing due to over-torqued connections. The Operator was forced to abandon frac operations until a solution could be found to restore integrity, withstand the surface pressures required to complete the frac job, and provide the required internal diameter to effectively and accurately perforate and frac the remaining stages.

Download

Overview
Document Type
Case History
Date Published
Monday, February 1, 2016
Region
North America, USA, TX
Additional Document Information
Environment:
Land
System Plan:
Planned
System Type:
ESeal HP Liner
Values Added:
Enable planned completion, Maximize Recoverable reserves
Casing Size:
5 1/2"
Expandable Size:
4 1/4"
Liner Length:
1001-2000'