ESeal™ Liner Restores Casing Integrity and Enables Successful Pressure Test

Summary:

An Operator needed to isolate a damaged interval in the existing 5-1/2 in. casing, when two previous patches attempts failed pressure testing.

Download

Overview
Document Type
Case History
Date Published
Monday, June 27, 2011
Region
North America, USA, TX

Additional Document Information

Environment:
Land
System Plan:
Planned
System Type:
ESeal, ESeal Liner
Values Added:
Mitigate risk, Enable planned completion, NPT reduced
Casing Size:
5 1/2"
Expandable Size:
4 1/4"
Liner Length:
<250'