ESeal HP Liner Reclaims Woodford Shale Well - Saves $8MM Investment

Summary:

A Major Mid-Continent Operator needed a solution that could cover four perforations that were prematurely shot in the heel of the horizontal Woodford Shale well.  The ESeal HP Liner was successfully tested to 13,500 psi and passed 31 fracturing stages to re-establish the fracturing program. 

Download

Overview
Document Type
Case History
Date Published
Saturday, November 1, 2014
Region
North America, USA, OK

Additional Document Information

Environment:
Land
System Plan:
Planned-Contingency
System Type:
ESeal, ESeal HP Liner
Values Added:
Enable planned completion, NPT reduced, Avoid replacement well/sidetrack
Casing Size:
5 1/2"
Expandable Size:
4 1/4"
Liner Length:
251-1000'