ESeal Liner Reduces Water Cut in Marcellus

Summary:

A major east coast Operator needed to cover and isolate two sets of perforations in the base casing. An ESeal Liner was chosen because three previous liners were performing successfully in the same area for this Operator. The perforations needed to be sealed so water influx could be stopped to return the well to maximum production.