ESeal Liner Restores Casing's Pressure Integrity

Summary:

An operator's well in the Marcellus Shale developed a split in the horizontal section during the primary cement job. Pressure integrity needed to be restored before the operator could continue completing the well.  

Download

Overview
Document Type
Case History
Date Published
Saturday, September 17, 2011
Region
North America, USA, PA

Additional Document Information

Environment:
Land
System Plan:
Contingency
System Type:
ESeal, ESeal Liner
Values Added:
Restore production, Maximize production, NPT reduced, Avoid replacement well/sidetrack
Casing Size:
5 1/2"
Expandable Size:
4 1/4"
Liner Length:
<250'