ESeal Patch Prevents Multiple Cement Squeezes

Summary:

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

Download

Overview
Document Type
Case History
Date Published
Thursday, November 21, 2013
Region
North America, USA, TX

Additional Document Information

Environment:
Land
System Plan:
Planned
System Type:
ESeal, ESeal Patch
Values Added:
Mitigate risk, Enable planned completion, Reduce well cost, Maximize ID and TD, Maximize production, NPT reduced, Avoid replacement well/sidetrack
Casing Size:
5 1/2"
Expandable Size:
4 1/4"
Liner Length:
<250'