Summary:

An Operator drilling multiple wells in South Texas encountered a loss zone 500 ft. below the shoe of the intermediate casing in their well. The Operator had also encountered this loss zone on two offset wells and was prepared with options to address the loss zone. Normally 9-5/8 in. casing is run as an intermediate casing string, but when this loss zone is encountered and 7-5/8 in. casing set, completing the well with 5-1/2 in. production casing becomes a challenge.

Download the full case study to see the solution.

Download

Overview
Document Type
Case History
Date Published
Thursday, April 5, 2018
Region
North America, USA, TX

Additional Document Information

Environment:
Land
System Plan:
Planned-Contingency
System Type:
ESET, OHL
Values Added:
Mitigate risk, Enable planned completion
Casing Size:
10 3/4"
Expandable Size:
8 5/8"
Liner Length:
251-1000'