SET® Enables Reaching Well Total Depth and Planned Formation Evaluation

Summary:

A Major Operator drilling an appraisal sidetrack well in the Deepwater Gulf of Mexico needed a solution to to cover and isolate a trouble zone that would enable them to stay on plan and reach well TD with the planned hole size. 

The record-setting SET installation, mitigated the risk of not reaching TD and enabled the Operator to perform the planned formation evaluation. 

Download

Overview
Document Type
Case History
Date Published
Wednesday, January 27, 2016
Region
North America, USA, GOM

Additional Document Information

Environment:
Deep-water
System Plan:
Planned
System Type:
OHL
Values Added:
Mitigate risk, Reduce well cost, Extended well life, Access new reserves, Evaluation enhancement, NPT reduced, Reach planned TD, Avoid replacement well/sidetrack
Casing Size:
11 7/8"
Expandable Size:
9 5/8"
Liner Length:
251-1000'