An Operator drilling a well in the Permian Basin needed a solution to isolate losses below their intermediate 9-5/8 in. casing string that was causing them to lose mud at a rate of 60 Bbls/hr., and achieve the required mud weight to drill the curve/lateral section of the well. After setting their intermediate casing to cover unexpected water flow, they were left vulnerable to the loss circulation zone below, requiring an additional casing point across the loss zone.

Download

Overview
Document Type
Case History
Date Published
Thursday, September 1, 2016
Region
North America, USA, TX
Additional Document Information
Environment:
Land
System Plan:
Planned
System Type:
OHL
Values Added:
Mitigate risk, Enable planned completion, Reduce well cost, Maximize ID and TD, NPT reduced, Reach planned TD
Casing Size:
9 5/8"
Expandable Size:
7 5/8"
Liner Length:
251-1000'