Three Expandable Liners Used to Attain Exploratory HPHT Well TD

Summary:

An operator needed to overcome drilling obstacles in their Gulf of Mexico, HPHT well.

Three SET® Systems were installed in this well and enabled the operator to reach the planned target. 

Download

Overview
Document Type
Case History
Date Published
Thursday, September 1, 2011
Region
North America, USA, GOM
Additional Document Information
Environment:
Shelf
System Plan:
Planned, Planned-Contingency
System Type:
OHL
Values Added:
Enable planned completion, Maximize ID and TD, Evaluation enhancement, NPT reduced, Reach planned TD
Casing Size:
7", 9 3/8", 11 7/8"
Expandable Size:
5 1/2", 7 5/8", 9 5/8"
Liner Length:
<250', 1001-2000', >3001