Using Pre-existing Infrastructure Adds ~$1M in Value

Summary:

3D seismic surveys identified deep exploratory pay interval targets below an existing field development. The Operator wanted to reach these potential pay targets by using the existing well infrastructure (by sidetracking) to drill deeper in the HPHT environment, while maintaining sufficient hole size to run a 7 in. production string through the reservoir.