Within a tight timeframe, identify, develop and execute the ~60 load cases defined as necessary and relevant for gas-tight qualification and to ensure fluid compatibility with the elastomers. Accurately place the system, with only a two-meter margin for error and expand the SET liner to repair a leak in the 9-5/8 in. production casing.
Register or log in to download the entire document.