Maximizing the throughput capacity of the existing NGL facility was a critical criterion. To retain maximum throughput, the operator elected to install a 5-1/2 x 7 in. cased-hole Solid Expandable Technology (SET®) system across the entire length of 7 in. casing.
Register or log in to download the entire document.