Repair NGL Storage Cavern

Summary: 

Maximizing the throughput capacity of the existing NGL facility was a critical criterion. To retain maximum throughput, the operator elected to install a 5-1/2 x 7 in. cased-hole Solid Expandable Technology (SET®) system across the entire length of 7 in. casing.

Translated files
Chinese version title: 
修补液化天然气储备洞

Register or log in to download the entire document.



© 2010 Enventure Global Technology. Enventure, the Triangle logo and SET are registered trademarks of Enventure Global Technology, L.L.C.     Terms & Conditions    Privacy Policy