Technical Library

Objective

09/14/2002

Install larger, corrosion-resistant production conduit.

11/09/2006

Install a high-collapse SET® expandable liner to case off the trouble zone.

04/19/2008

Isolate the trouble zone while conserving hole size by planning solid expandable technology into the well design; optimize wellbore trajectory and reduce risk in sidetrack drilling operations.

09/17/2008

Install a SET® Openhole solid expandable system fitted with injection-moulded composite standoff blades.

Pages