Install a 7-5/8 x 9-5/8 in. SET Openhole Liner (OHL) to isolate higher pressure zones so that mud weight could be reduced to combat lost circulation.

06/30/2000

Optimizing the casing program is one of the most critical factors in well design for deepwater applications. Conventional design often dictates that very large surface casing be used to allow passage of a high number of subsequent casing strings telescoping down in size that are required to...

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

09/12/2004

Solid expandable tubular technology presents an opportunity to significantly boost the production capacity of wells by increasing the size of the completion. As such, it offers an economically attractive and environmentally friendly option to breathe new life into gas fields. It is flexible in...

03/30/2009

Save the wellbore by installing a SET® 7-5/8" x 9-5/8" 53.5# Openhole Liner over a 420.86 ft (128.28m) interval to isolate the weak section.

08/01/2011

Challenge: Redevelop an established Gulf of Mexico deepwater field by accessing additional reserves.

08/20/2006

Within a tight timeframe, identify, develop and execute the ~60 load cases defined as necessary and relevant for gas-tight qualification and to ensure fluid compatibility with the elastomers. Accurately place the system, with only a two-meter margin for error and expand the SET liner to...

03/03/2005

Preserve hole size by implementing a contingency plan that included two SET® solid expandable liners and one conventional API liner run below the well’s planned 11-7/8 in. drilling liner.