Technical Library

Objective

04/21/2004

Regain pressure integrity of the 7-3/4 in. production liner for stacked FracPac™ completion operations using Solid Expandable Tubular (SET™) technology.

05/05/2006

Get back on planned drilling program and finish the well with an adequate hole size to evaluate potential production zones at TD.

01/03/2009

Install a 7-5/8 x 9-5/8 in. SET Openhole Liner (OHL) to isolate higher pressure zones so that mud weight could be reduced to combat lost circulation.

Pages