Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

03/01/2010

Enventure's 4-1/4 x 5-1/2 inch, 17 lb/ft ESeal Liner was installed in a Barnett Shale 3000 ft lateral wellbore to isolate existing perforations while allowing fracturing of new shale colume between old perforation clusters.

09/17/2011

An operator's well in the Marcellus Shale developed a split in the horizontal section during the primary cement job. Pressure integrity needed to be restored before the operator could continue completing the well.  

12/07/2007

As part of a multi-well program, isolate severe water-thief zones in a field where squeezing, casing patches and dual packer isolation assemblies rarely worked. The solution increased production and ultimately resulted in higher reserves.

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

01/01/2012

A major east coast Operator needed to cover and isolate two sets of perforations in the base casing. An ESeal Liner was chosen because three previous liners were performing successfully in the same area for this Operator. The perforations needed to be sealed so water influx could be stopped to...

02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.