Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

12/28/2011

The Operator had two sections of perforations in 4-1/2 in. casing that needed to be repaired. They required a solution that would repair the 4-1/2 in. casing and still maintain sufficient ID for this well to be used as a power water injector well.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
01/01/2012

A major east coast Operator needed to cover and isolate two sets of perforations in the base casing. An ESeal Liner was chosen because three previous liners were performing successfully in the same area for this Operator. The perforations needed to be sealed so water influx could be stopped to...

11/01/2014

A Major Mid-Continent Operator needed a solution that could cover four perforations that were prematurely shot in the heel of the horizontal Woodford Shale well.  The ESeal HP Liner was successfully tested to 13,500 psi and passed 31 fracturing stages to re-establish the fracturing program. 

03/18/2015

A major Operator in the Permian wanted to start its frac program on a well, but found that nearly 200 ft of the 5-1/2 in. production casing had collapsed.  The ESeal HP Liner ID was sufficient enough for the planned frac treatment to be completed ensuring a return on the $2M investment to drill...

Pages