12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

09/17/2011

An operator's well in the Marcellus Shale developed a split in the horizontal section during the primary cement job. Pressure integrity needed to be restored before the operator could continue completing the well.  

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

12/18/2009

The Operator wanted to repair the well and continue production through the 2-7/8-in. production tubing with a retrievable packer set at 11,335 ft. in the 5-1/2-in.17 lb/ft. casing.

06/27/2011

An Operator needed to isolate a damaged interval in the existing 5-1/2 in. casing, when two previous patches attempts failed pressure testing.