Technical Library

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

09/17/2011

An operator's well in the Marcellus Shale developed a split in the horizontal section during the primary cement job. Pressure integrity needed to be restored before the operator could continue completing the well.  

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

06/27/2011

An Operator needed to isolate a damaged interval in the existing 5-1/2 in. casing, when two previous patches attempts failed pressure testing.

05/30/2018

The ESeal Flex expandable system is an expandable solution primarily designed for well completions, stimulations, and workovers.

06/01/2018

The ESeal Patch is a single-joint, solid steel, expandable casing patch for operators who need a permanent, inexpensive casing patch solution that reliably restores well integrity.

06/01/2018

In cased-hole environments, ESeal Liner systems provide a solution to mitigate troubled casing intervals in onshore and offshore applications.