Technical Library

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

09/17/2011

An operator's well in the Marcellus Shale developed a split in the horizontal section during the primary cement job. Pressure integrity needed to be restored before the operator could continue completing the well.  

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

12/18/2009

The Operator wanted to repair the well and continue production through the 2-7/8-in. production tubing with a retrievable packer set at 11,335 ft. in the 5-1/2-in.17 lb/ft. casing.

11/01/2014

A Major Mid-Continent Operator needed a solution that could cover four perforations that were prematurely shot in the heel of the horizontal Woodford Shale well.  The ESeal HP Liner was successfully tested to 13,500 psi and passed 31 fracturing stages to re-establish the fracturing program. 

05/30/2018

The ESeal Flex expandable system is an expandable solution primarily designed for well completions, stimulations, and workovers.

Pages