Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

05/16/2004

Accurately install SET® Openhole Clad solid expandable systems featuring water-sensitive swelling elastomer seals. The installation further proved SET® technology applied for the first time a year earlier in another field.

 

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

12/07/2007

As part of a multi-well program, isolate severe water-thief zones in a field where squeezing, casing patches and dual packer isolation assemblies rarely worked. The solution increased production and ultimately resulted in higher reserves.

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.