Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

06/30/1999

Expandable-tubular technology involves a process that expands casing in oil wells drilled in especially challenging environments, such as deepwater. Until now, operators have had to use progressively smallerdiameter pipe as a well was drilled deeper; but expandable-tubular goods are designed for...

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

06/27/2011

An Operator needed to isolate a damaged interval in the existing 5-1/2 in. casing, when two previous patches attempts failed pressure testing.

02/18/2015

A major Operator in the Marcellus required a solution to seal squeeze perforations which would have to withstand high pressure frac operations. The area Regulatory Agency had suspended operations, not allowing completion of the well due to poor cement behind the production casing. The Operator...

03/18/2015

A major Operator in the Permian wanted to start its frac program on a well, but found that nearly 200 ft of the 5-1/2 in. production casing had collapsed.  The ESeal HP Liner ID was sufficient enough for the planned frac treatment to be completed ensuring a return on the $2M investment to drill...