Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

06/30/1999

Expandable-tubular technology involves a process that expands casing in oil wells drilled in especially challenging environments, such as deepwater. Until now, operators have had to use progressively smallerdiameter pipe as a well was drilled deeper; but expandable-tubular goods are designed for...

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

03/01/2010

Enventure's 4-1/4 x 5-1/2 inch, 17 lb/ft ESeal Liner was installed in a Barnett Shale 3000 ft lateral wellbore to isolate existing perforations while allowing fracturing of new shale colume between old perforation clusters.

12/07/2007

As part of a multi-well program, isolate severe water-thief zones in a field where squeezing, casing patches and dual packer isolation assemblies rarely worked. The solution increased production and ultimately resulted in higher reserves.

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

08/30/2013

Results from two case histories in shale plays indicate that the use of an expandable refrac liner gives comparable, or better, gas production than other methods of perforation isolation, and provides assurance
for frac stage injectivity.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
01/01/2012

A major east coast Operator needed to cover and isolate two sets of perforations in the base casing. An ESeal Liner was chosen because three previous liners were performing successfully in the same area for this Operator. The perforations needed to be sealed so water influx could be stopped to...