Technical Library

04/19/2008

Isolate the trouble zone while conserving hole size by planning solid expandable technology into the well design; optimize wellbore trajectory and reduce risk in sidetrack drilling operations.

06/30/1999

Expandable-tubular technology involves a process that expands casing in oil wells drilled in especially challenging environments, such as deepwater. Until now, operators have had to use progressively smallerdiameter pipe as a well was drilled deeper; but expandable-tubular goods are designed for...

02/22/2000

Establishing and maintaining hydraulic integrity between liner hangers and the base casing in which they are set has long been one of the most problematic areas facing operators. With failure rates on pressure seals in overlaps now exceeding 40% in some regions, the need for a solution to this...

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

02/08/2010

In 2009, a global super-major operating out of Borneo experienced problems with a well it was running from a drillship in over 5,000 feet of water off of the Sarawakan coast. An initial exploration well working a straight hole in a shale formation, the operator encountered an unstable...

12/29/2009

A major operator was sidetracking out of an existing well to a nearby reservoir.The first attempt to sidetrack utilizing a conventional casing design failed to reach the target depth and damaged the 13-3/8 in. casing.

The casing design for a...

11/01/2010

By ensuring optimal hole size, well designs using solid expandable tubulars have a far-reaching effect on drilling, evaluation, completion and life-of-well solutions. Enventure Global Technology's Kevin Waddell, Jerry Fritsch and Kristaq Mitrushi discuss the growing influence of solid...

12/01/2006

Isolate a low fracture-gradient zone to enable an optimal completion.

01/03/2012

BP experienced losses while drilling a development well due to weak sand formation directly below the 13-3/8in. shoe. Multiple attempts were made to stem the losses - all without success.
A solution was required to isolate the weak sand formation and enable drilling to continue with higher...