Technical Library

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/03/2007

Mitigate shale formations, in which loss of returns and sticking are common, by combining SET® expandable tubulars with sidetracking operations in order to reach additional reserves with optimized hole size.

03/09/2004

Drill through 200 feet of depleted sands, add a casing point and reach the pay target (measured depth between 11,000 to 13,000 feet) with adequate hole size while maintaining the smallest upper wellbore possible.

10/15/2008

Optimize project economics, well design and drilling efficiency with application of SET solid expandable technology.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

06/30/2000

Optimizing the casing program is one of the most critical factors in well design for deepwater applications. Conventional design often dictates that very large surface casing be used to allow passage of a high number of subsequent casing strings telescoping down in size that are required to...