Objective

09/14/2002

Install larger, corrosion-resistant production conduit.

09/12/2004

Solid expandable tubular technology presents an opportunity to significantly boost the production capacity of wells by increasing the size of the completion. As such, it offers an economically attractive and environmentally friendly option to breathe new life into gas fields. It is flexible in...

02/22/2005

During initial completion operations on a deepwater subsea oil well in the Gulf of Mexico, the 7-3/4 in., 46.1 lb/ft casing failed the pressure test in the production liner. Subsequent operations located the casing leak 1,800 ft above the target completion intervals. The original completion was...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
05/01/2013

A major operator in the Middle East encountered significant corrosion in 7" base casing on one of its injection wells in an important onshore oil field. The corrosion of the pipe presented a safety risk, as well as, a commercial concern that well integrity would be jeopardized and reduce...

11/04/2011

The ESeal Liner provided the maximum flow area for injector fluids resulting in greater injection volumes and rates due to less friction pressure loss during injection.  The standard conventional scab liner is the 5 in. liner which provides a 4.481 in. ID., while the 5½ x 7 in. ESeal liner...

04/11/2007

A Corrosion across the entire 1,100 ft. of 7 in. casing installed in a natural gas liquids (NGL) storage cavern risked NGL leakage into the surrounding formation.

12/18/2009

The Operator wanted to repair the well and continue production through the 2-7/8-in. production tubing with a retrievable packer set at 11,335 ft. in the 5-1/2-in.17 lb/ft. casing.