Technical Library

05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

11/28/2013

The SET liner permanetly isolated the loss zone allowing the well to maximize reservoir contact.

02/12/2015

An Operator planned to maximize production in a 30+-year-old well by directionally deepening the well to intersect an undeveloped reservoir.  After the high-pressure formation was drilled, a 5-1/2 in. SET Openhole Liner (OHL) successfully isolated the formation while maintaining maximum wellbore...