In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...
An operator in the northern Colorado, Piceance basin discovered a part in 4-1/2 in. base casing. The casing split meant they would not be able to complete the lower six stages of the well. The operator initially used conventional methods in an effort to repair the damaged casing to recover the...
The Operator had two sections of perforations in 4-1/2 in. casing that needed to be repaired. They required a solution that would repair the 4-1/2 in. casing and still maintain sufficient ID for this well to be used as a power water injector well.
An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.
A major Operator in the Anadarko Basin of Oklahoma lost pressure integrity during completion / frac operation. A 3-1/2" ESeal HP Liner straddled the parted packer, restoring pressure integrity, and enabling the Operator to continue their completion / frac operations
The challenge was to cover and isolate a hole in the vertical section of a horizontal well to continue with the planned high-pressure 14-stage fracturing program.
ESeal™ HP Patch systems: A high-performance wellbore repair solution.
These systems utilize a higher yield-strength material than standard ESeal systems. The material’s increased burst and collapse ratings provide enhanced performance and reliability.