05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...