07/16/2010

A leading onshore natural gas producer working Northern Louisiana experienced problems along the vertical section of a horizontal development well.

Enventure deployed two ESeal Liners enabling them to continue the planned completion.

12/28/2011

The Operator had two sections of perforations in 4-1/2 in. casing that needed to be repaired. They required a solution that would repair the 4-1/2 in. casing and still maintain sufficient ID for this well to be used as a power water injector well.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...