Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

05/05/2006

Get back on planned drilling program and finish the well with an adequate hole size to evaluate potential production zones at TD.

03/09/2004

Drill through 200 feet of depleted sands, add a casing point and reach the pay target (measured depth between 11,000 to 13,000 feet) with adequate hole size while maintaining the smallest upper wellbore possible.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

05/16/2004

Accurately install SET® Openhole Clad solid expandable systems featuring water-sensitive swelling elastomer seals. The installation further proved SET® technology applied for the first time a year earlier in another field.

 

09/30/2000

As the oil and gas industry has matured, three broadreaching and long-standing issues that affect virtually every well have assumed heightened importance: conservation of hole size, hydraulic isolation of selected zones, and maximization of well life. All of these issues involve one of the...

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

07/16/2010

A leading onshore natural gas producer working Northern Louisiana experienced problems along the vertical section of a horizontal development well.

Enventure deployed two ESeal Liners enabling them to continue the planned completion.