Technical Library

Objective

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

10/15/2014

Larger SET® Systems were designed to mitigate the risks inherent in drilling complex and exploratory wells.

Larger solid expandable systems are planned as a basis-of-design (BOD) in the upper portion of the wellbore. This enables operators to maintain internal diameter (ID) early in the...

05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

07/16/2010

A leading onshore natural gas producer working Northern Louisiana experienced problems along the vertical section of a horizontal development well.

Enventure deployed two ESeal Liners enabling them to continue the planned completion.

06/01/2018

ESeal™ HP Patch systems: A high-performance wellbore repair solution.

These systems utilize a higher yield-strength material than standard ESeal systems. The material’s increased burst and collapse ratings provide enhanced performance and reliability.

From re-completions to field...

03/01/2010

Enventure's 4-1/4 x 5-1/2 inch, 17 lb/ft ESeal Liner was installed in a Barnett Shale 3000 ft lateral wellbore to isolate existing perforations while allowing fracturing of new shale colume between old perforation clusters.

05/30/2018

The ESeal Flex expandable system is an expandable solution primarily designed for well completions, stimulations, and workovers.

12/28/2011

The Operator had two sections of perforations in 4-1/2 in. casing that needed to be repaired. They required a solution that would repair the 4-1/2 in. casing and still maintain sufficient ID for this well to be used as a power water injector well.

Pages