Technical Library

Objective

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/03/2007

Mitigate shale formations, in which loss of returns and sticking are common, by combining SET® expandable tubulars with sidetracking operations in order to reach additional reserves with optimized hole size.

05/05/2006

Get back on planned drilling program and finish the well with an adequate hole size to evaluate potential production zones at TD.

11/09/2006

Install a high-collapse SET® expandable liner to case off the trouble zone.

03/09/2004

Drill through 200 feet of depleted sands, add a casing point and reach the pay target (measured depth between 11,000 to 13,000 feet) with adequate hole size while maintaining the smallest upper wellbore possible.

04/19/2008

Isolate the trouble zone while conserving hole size by planning solid expandable technology into the well design; optimize wellbore trajectory and reduce risk in sidetrack drilling operations.

10/15/2008

Optimize project economics, well design and drilling efficiency with application of SET solid expandable technology.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

Pages