03/03/2005

Preserve hole size by implementing a contingency plan that included two SET® solid expandable liners and one conventional API liner run below the well’s planned 11-7/8 in. drilling liner.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
04/11/2014

In the Utica Shale, an Operator drilled three wells and experienced loss zones and formation integrity issues.

04/20/2014

A major Operator in the North Sea required isolation of a high pressure gas-bearing zone to enable safe drilling and logging of the reservoir section, as well as, a solution to isolate a leaking stage tool in the 9-5/8 in. base casing.