12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

05/05/2009

To completely isolate the main pay zone (MPZ) from lower residual oil zone (ROZ) with options to set conventional liner in future if needed for conformance work. Installation of 5-1/2” x 7”, 23 lb ESeal Liners to isolate the upper perforations in each well would enable injection through newly-...

07/16/2010

A leading onshore natural gas producer working Northern Louisiana experienced problems along the vertical section of a horizontal development well.

Enventure deployed two ESeal Liners enabling them to continue the planned completion.

12/07/2007

As part of a multi-well program, isolate severe water-thief zones in a field where squeezing, casing patches and dual packer isolation assemblies rarely worked. The solution increased production and ultimately resulted in higher reserves.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

02/18/2015

A major Operator in the Marcellus required a solution to seal squeeze perforations which would have to withstand high pressure frac operations. The area Regulatory Agency had suspended operations, not allowing completion of the well due to poor cement behind the production casing. The Operator...