05/05/2006

Get back on planned drilling program and finish the well with an adequate hole size to evaluate potential production zones at TD.

01/30/2014

A gas production well had been plugged and abandoned since it was first drilled in 2008 after a hole in the 9-5/8 in. production liner was discovered, through which fluid leaked into the formation. Previous attempts to isolate the damaged casing through cement squeezing had proven unsuccessful...