05/07/2010
- Operator was experiencing trouble formation caused by narrow pore pressure/fracture gradient window which caused casing to be set higher than planned.
- Operator decided that expandables were the way to go.
- All of the customer's operating objectives were met.
05/02/2010
The customer was sidetracking the well, and unable to run their 16-inch liner. The 13-5/8 inch and 11-3/4 inch casing were both set high, which would compromise the originally planned 8-1/2 inch hole size.
The operator selected a 9-5/8 x 11-3/4 in. SET®...
11/01/2010
By ensuring optimal hole size, well designs using solid expandable tubulars have a far-reaching effect on drilling, evaluation, completion and life-of-well solutions. Enventure Global Technology's Kevin Waddell, Jerry Fritsch and Kristaq Mitrushi discuss the growing influence of solid...
07/15/2013
While drilling an exploration well, an Operator encountered a narrow pore pressure/fracture gradient window that required using more casing strings than planned.