Technical Library

05/07/2010
  • Operator was experiencing trouble formation caused by narrow pore pressure/fracture gradient window which caused casing to be set higher than planned.
  • Operator decided that expandables were the way to go.
  • All of the customer's operating objectives were met.
07/01/2007

Install a 13-3/8 x 16 in. 97.0 lb/ft openhole solid expandable tubular (SET®) system to extend the 16 in. casing section past the trouble zone—preserving the set point for the following 13-3/8 in. standard casing and enabling successful execution of the well plan.