Regain pressure integrity of the 7-3/4 in. production liner for stacked FracPac™ completion operations using Solid Expandable Tubular (SET™) technology.

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

06/27/2011

An Operator needed to isolate a damaged interval in the existing 5-1/2 in. casing, when two previous patches attempts failed pressure testing.

11/01/2014

A Major Mid-Continent Operator needed a solution that could cover four perforations that were prematurely shot in the heel of the horizontal Woodford Shale well.  The ESeal HP Liner was successfully tested to 13,500 psi and passed 31 fracturing stages to re-establish the fracturing program. 

03/30/2015

An Operator in the West Virginia Marcellus Shale required a cost-effective solution to seal off old perforations to enable high-pressure refrac operations.  The ESeal RF Liner was successfully installed in the horizontal wellbore and tested to 9,500 psi.