Technical Library

12/16/2007

Implement an ESeal solution that would enable targeted completion with packer seats while also repairing the damaged vertical section of casing in the Barnett.

12/11/2009

Surface temperature at Tucker Lake in Canada’s Saskatchewan province see temperatures below 40°F below. Below surface steam injection exposes wells to temperatures well exceeding 500°F. One such well, operated by a Calgary-based company, had experienced casing failure at about...

05/07/2010
  • Operator was experiencing trouble formation caused by narrow pore pressure/fracture gradient window which caused casing to be set higher than planned.
  • Operator decided that expandables were the way to go.
  • All of the customer's operating objectives were met.
05/02/2010

The customer was sidetracking the well, and unable to run their 16-inch liner. The 13-5/8 inch and 11-3/4 inch casing were both set high, which would compromise the originally planned 8-1/2 inch hole size.

 

The operator selected a 9-5/8 x 11-3/4 in. SET®...

12/29/2009

A major operator was sidetracking out of an existing well to a nearby reservoir.The first attempt to sidetrack utilizing a conventional casing design failed to reach the target depth and damaged the 13-3/8 in. casing.

The casing design for a...

11/01/2010

By ensuring optimal hole size, well designs using solid expandable tubulars have a far-reaching effect on drilling, evaluation, completion and life-of-well solutions. Enventure Global Technology's Kevin Waddell, Jerry Fritsch and Kristaq Mitrushi discuss the growing influence of solid...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
07/15/2013

While drilling an exploration well, an Operator encountered a narrow pore pressure/fracture gradient window that required using more casing strings than planned.