Isolate multiple zones while maximizing diameter by installing a SET Open-hole Liner with swellable elastomers. The maximum diameter would help reduce fluid friction during high-rate fracturing operations.

09/01/2011

An operator needed to overcome drilling obstacles in their Gulf of Mexico, HPHT well.

Three SET® Systems were installed in this well and enabled the operator to reach the planned target. 

03/13/2012
An operator drilling a sub-salt exploration deepwater well in Gulf of Mexico, experienced an unstable wellbore at the base of the salt; which resulted in setting the 9-7/8 in. liner 3,400 ft higher than originally planned.
In exploratory wells, maintaining hole size is critical due...
02/01/2013

A large independent Operator discovered several leaks and a parted section in the 7 in. production casing from 2,000 ft. to 500 ft. In order to fracture the well, casing integrity had to be restored to handle over 6,000 psi surface fracture pressure to ensure the well could become a viable asset...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
04/11/2007

A Corrosion across the entire 1,100 ft. of 7 in. casing installed in a natural gas liquids (NGL) storage cavern risked NGL leakage into the surrounding formation.