Technical Library

11/09/2006

Install a high-collapse SET® expandable liner to case off the trouble zone.

09/20/2018

An Operator drilling a well offshore Mexico, encountered a depleted sand formation while drilling below their 9-7/8 in. casing. The well was planned to be completed with 7 in. production string at TD and through the 9-7/8 in. casing. If conventional casing would be run to cover the depleted zone...