Technical Library

09/08/2015

A major operator in the Norwegian North Sea anticipated problems while drilling a    12-¼ x 13-½ in. hole section which required setting 10-¾ in. casing early. This left a section of overburden exposed above the reservoir. 

The 8-5/8 in. ESET HP System isolated the overburden section,...