Get back on planned drilling program and finish the well with an adequate hole size to evaluate potential production zones at TD.

11/29/2003

Making Enventure's Solid Expandables a part of the drilling plan enabled deep-water operators in the Mississippi Canyon to cut their previous drilling time from 140 days to just 48.  Installing over 2700 feet of Solid Expandable liners running at depths up to 4100 feet allowed...

09/30/2000

As the oil and gas industry has matured, three broadreaching and long-standing issues that affect virtually every well have assumed heightened importance: conservation of hole size, hydraulic isolation of selected zones, and maximization of well life. All of these issues involve one of the...

03/30/2009

Save the wellbore by installing a SET® 7-5/8" x 9-5/8" 53.5# Openhole Liner over a 420.86 ft (128.28m) interval to isolate the weak section.

05/04/2011

An major operator received one of the first post-Macondo permits to continue drilling an exploratory well in the deepwater Gulf of Mexico using subsea BOP's.

The operator needed to achieve zonal isolation across shallow hydrocarbon-bearing sands and to reduce ECD's during cementing...

10/15/2014

SET technology is the result of a cold-working process that permanently deforms the pipe without any additional heat. The procedure inherent to expanding tubulars takes the steel beyond its elastic limit into the plastic region of the stress-strain curve, while remaining safely below ultimate...

03/26/2007

Install a Solid Expandable Tubular (SET®) system to isolate the trouble zones. Retain hole size across all the depleted sands in a narrow pore pressure/fracture gradient environment....

10/15/2014

In openhole environments, SET® Systems provide a variety of solutions including mitigating risk, adding casing strings, and isolating trouble formations while retaining maximum internal diameter.