Technical Library

Objective

09/14/2002

Install larger, corrosion-resistant production conduit.

01/03/2009

Install a 7-5/8 x 9-5/8 in. SET Openhole Liner (OHL) to isolate higher pressure zones so that mud weight could be reduced to combat lost circulation.

09/30/2000

As the oil and gas industry has matured, three broadreaching and long-standing issues that affect virtually every well have assumed heightened importance: conservation of hole size, hydraulic isolation of selected zones, and maximization of well life. All of these issues involve one of the...

09/12/2004

Solid expandable tubular technology presents an opportunity to significantly boost the production capacity of wells by increasing the size of the completion. As such, it offers an economically attractive and environmentally friendly option to breathe new life into gas fields. It is flexible in...

05/07/2010
  • Operator was experiencing trouble formation caused by narrow pore pressure/fracture gradient window which caused casing to be set higher than planned.
  • Operator decided that expandables were the way to go.
  • All of the customer's operating objectives were met.
11/01/2010

By ensuring optimal hole size, well designs using solid expandable tubulars have a far-reaching effect on drilling, evaluation, completion and life-of-well solutions. Enventure Global Technology's Kevin Waddell, Jerry Fritsch and Kristaq Mitrushi discuss the growing influence of solid...

05/04/2011

An major operator received one of the first post-Macondo permits to continue drilling an exploratory well in the deepwater Gulf of Mexico using subsea BOP's.

The operator needed to achieve zonal isolation across shallow hydrocarbon-bearing sands and to reduce ECD's during cementing...

09/19/2006

Leverage information gained from the first well in the development project and install Solid Expandable Tubular (SET®) systems to the subsequent wells to save casing points and preserve hole size while drilling through shale formations and depleted zones.

03/03/2005

Preserve hole size by implementing a contingency plan that included two SET® solid expandable liners and one conventional API liner run below the well’s planned 11-7/8 in. drilling liner.

Pages